BoQ Rates

Rates for Civil works (warmshell + finishes) :

Type Upto 10000 sqft Upto 25000 sqft Upto 50000 sqft Upto 100000 sqft
Residential Rs. 30,000/- Rs. 3 / sqft Rs. 3 / sqft Rs. 3 / sqft
Commercial Rs. 28,000/- Rs. 2.75 / sqft Rs. 2.5 / sqft Rs. 2.5 / sqft
Institutional Rs. 35,000/- Rs. 3.5 / sqft Rs. 3.25 / sqft Rs. 3 / sqft
Industrial Rs. 25,000/- Rs. 2.5 / sqft Rs. 2.25 / sqft Rs. 2/ sqft

For Floor Area above 100000 sqft, please contact our representative for pricing.

Note:

  1. In case of typical floor plans, for the sake of billing and payments:

First floor shall be considered as 100% floor area.

For each additional typical floor plan– 50% of effective floor area shall be assumed till 5th floor

– 25% of effective floor area shall be assumed from 6th floor onward

 

  1. The rates for MEP, HVAC, Firefighting, Landscaping, development works and any other items not explicitly given here shall be obtained and confirmed before payment of advance amount.

 

  1. Revisions, Changes, Corrections: Shall be charged at pro-rata on floor plan coverage of min 10% and multiples thereof upto 50% of floor area.

If more than 50% of details are revised, changed or corrected, it shall be considered as a new plan and corresponding rates shall be applied accordingly.

 

  1. Incomplete / Missing details :

In case of incomplete/missing details, reasonable assumptions shall be made to complete the boq in all aspects. Where entire WBS item such as structural details are missing, BoQ job may not be possible and a refund may be initiated.

 

BoQ (Bill of Quantities) is a document containing the quantities of all measurable work activities in a construction project.

A BoQ can be considered as a base document for planning, budgeting, scheduling, tracking work progress, vendor billing and payments, scope deviation and its impact on budget, creating change orders, managing fund flow and several other activities required for managing a construction project efficiently.

While BoQ summarises the quantities of measurable works in a project, the BoM (Bill of Materials) essentially derived from the BoQ and resource utilisation / composition charts provides us the quantities of materials that are going to be consumed for the given quantities of works in the BoQ.

Yes, for all standard construction activities, the BoM can be generated by the user from the BoQ made available on the cloud.

No. However, a nominal market rate for each standard schedule item may be provided as a sample for the sake of preliminary project budgeting. Actual costing service may be availed seperately.

When calculated properly, BoQ forms a good base data from which many project deliverables can be monitored, tracked and controlled to achieve milestones effectively thereby reducing overheads and achieving the desired profitability.

The time for completion of BoQ for a regular building plan may be as follows:

Civil warmshell and Finishes            –           1 week

Electrical and Plumbing                    –           1 week each

A complete checklist is given below. In order to complete the BoQ without delays, please ensure that all documents are submitted in full and details are correct in all aspects.:

 

 BOQ Checklist Details
S.No Description Details Available
1 Client name/Address
2 Client Requirement with Design specifications (scope document)
3 Type of Building
4 Scale & Dimension Details
5 Final drawing
6 Center Line Marking
7 Structural Drawing
7.a Footing
7.b Column
7.c Plinth Beam
7.d Roof Beam
7.e Roof Slab
7.f Staircase Details
7.g Canopy
7.h Pergola
7.i Lift
7.j Steel Fabrication
8 Section Details
9 Elevation Details
10 Joinery Details
11 Flooring Details
12 General Specification Details
13 Furniture Layout
14 Electrical Details
16 False ceiling details
17 Plumbing Details
18 Landscaping Details
19 Compound Wall Details
20 Fire & Safety Details

BoQ summary for all the work groups in the given scope.

BoQ abstract

It will be available for a period of 6 months from the date of delivery of initial BoQ.

You don't have permission to register