Painting looks easy because the last action is only a brush or roller moving across a wall. The expensive part is usually hidden underneath: finding dampness, removing weak paint, filling cracks, smoothing the background, choosing a primer that suits it, and allowing each layer to dry. A cheap quotation can therefore become expensive through extras, early repainting or damage to floors, furniture and fittings.

This guide will not turn you into a paint technologist. It gives you enough practical information to compare quotations, agree a clear contract, recognise shortcuts and check the completed work.

  1. Before You Hire: Get These Things in Writing

Do not accept a quotation that only says “two coats premium paint” and gives a rate per square foot or square metre. Ask for the following.

  1. The exact areas. List rooms, ceilings, internal walls, external elevations, doors, windows, railings, pipes, gates, built-in furniture and any surfaces excluded. State whether measurement includes or deducts openings.
  2. The existing condition. New plaster, old emulsion, glossy enamel, damp or chalky walls, rusting metal and weathered timber need different preparation. Ask the contractor to record peeling, mould, cracks, stains and water entry before pricing.
  3. The complete paint system. Write every layer: cleaner or biocide, crack repair, putty, primer, undercoat, intermediate coat and finish coats. “Primer plus two coats” is not enough unless the products and surfaces are named.
  4. Brand and product, not brand alone. Every large manufacturer sells economy, standard and premium ranges. Write the manufacturer, product name, colour code, sheen, pack size and number of coats. “Asian Paints,” “Dulux,” “Berger,” “Jotun” or “Sherwin-Williams” alone does not identify what you are buying.
  5. Who buys the material. If you buy it, agree the estimated quantity, delivery checks and ownership of leftovers. If the contractor buys it, require sealed original packs, invoices and a record of batch numbers.
  6. Preparation level. Agree whether the job is basic cleaning and spot repair, normal repaint preparation, or a near-perfect smooth finish. The Painting Contractors Association recognises several preparation levels because better appearance needs more filling and sanding, and therefore more labour (PCA P14).
  7. Mock-up. Ask for one complete sample panel or small room showing the actual primer, colour, sheen, roller texture and repaired background. Approved mock-ups are used in professional painting specifications as the quality benchmark (MPI exterior painting guide).
  8. Protection and access. State who moves furniture, removes curtains and cover plates, protects floors, supplies scaffolding or a mobile tower, and cleans overspray or splashes.
  9. Programme and drying time. Separate working days from calendar days. Humidity, cool weather and heavy film can lengthen recoat and cure times; manufacturers’ stated times normally assume controlled test conditions (Dulux finishing schedule).
  10. Acceptance and defects. Agree the viewing conditions, touch-up rule, snagging process, warranty period and retention before work starts.

Questions That Reveal an Experienced Painter

  • “How will you find the cause of this damp patch before painting it?” The right answer is to stop the water source and let the wall dry, not hide it with putty.
  • “How will you test whether the old paint is sound?” A competent painter should mention scraping, cross-cut/tape testing or a trial patch, not simply sanding everything lightly.
  • “Which primer suits this wall, metal or timber, and why?” Different substrates need different primers.
  • “What is the full product name and data-sheet recoat time?” A professional should be able to show the manufacturer’s technical data sheet.
  • “Where will you make the sample panel, and who approves it?”
  • “How will you protect floors, glass, hardware, switches, appliances and neighbours’ property?”
  • “Will you brush, roll or spray? If spraying, how will you contain mist and ventilate the area?”
  1. Choose the Right Painting Method

The word “paint” covers several different systems. The method should follow the surface and exposure, not fashion alone.

Method Typical use Main advantage Main risk to control
Interior emulsion Plastered or board walls and ceilings Low odour, broad colour and sheen choice, easy maintenance Damp background, weak putty, visible patches and roller marks
Enamel Doors, frames, trim, railings and small metal items Harder, smoother and more washable finish Poor de-glossing, incompatible primer, slow cure or solvent odour
Textured or decorative coating Feature walls and façades Hides minor visual variation and creates a deliberate pattern Repairs remain visible; applicator technique changes the pattern
Exterior acrylic or elastomeric coating Weather-exposed masonry Better rain and UV resistance; elastomeric grades can bridge small static cracks Painting active cracks, damp walls or during unsuitable weather
Mineral paint or limewash Lime/mineral plaster, heritage or vapour-open walls Breathable, matt mineral appearance Incompatible old acrylic coating and uneven suction
Protective metal coating Structural steel, tanks, gates and exposed steelwork Corrosion protection when preparation and film thickness are correct Painting over rust, salts or grease; missed edges and wrong recoat window
Clear or stained wood coating Doors, windows, panelling and furniture Preserves the timber appearance Moist wood, resin, poor sanding and UV exposure

 

A resource choice can change the method. For example, a two-component epoxy or polyurethane has a mixing ratio, pot life and safety controls that ordinary water-based wall paint does not. Clear timber work needs sample approval because filler, stain and sanding alter the final colour.

  1. Surface Preparation Is Most of the Job

A sound finish needs a clean, dry and stable base. MPI specifications include moisture testing, cleaning, crack repair, patching, sealing and priming within painting work, not as optional favours (MPI interior painting guide).

New Plaster, Concrete and Masonry

  • Let the background cure and dry. Many architectural paint instructions use about 28–30 days for new cement plaster or masonry, but the approved product data sheet and measured moisture/pH take priority (Benjamin Moore Regal Select data, Dulux 1Step Prep).
  • Remove loose sand, dust, curing compound, oil, salt deposits and splashes.
  • Repair the source of dampness before filling or painting. Paint is not waterproofing for a leaking wall.
  • Use a primer that suits alkalinity and porosity. A very porous or chalky wall may need a penetrating sealer; a normal sound plaster may need an acrylic or alkali-resistant primer.

Gypsum Board and False Ceilings

The board-joint finish must match the lighting and paint sheen. Smooth walls with glossy paint, dark colours or strong side-light reveal joints and tool marks more than flat pale paint. GA-214 defines board finishing levels and recommends mock-ups because drawings alone cannot predict appearance under actual lighting (GA-214-2021, Gypsum Association FAQ). Ask who is responsible for correcting visible joints: the board contractor or the painter.

Previously Painted Walls

  • Wash dirt, grease and soap residue.
  • Kill and remove mould; do not simply cover it. Moisture and poor ventilation must also be corrected (Benjamin Moore mildew guidance).
  • Scrape loose paint and feather the edges smooth.
  • Dull glossy coatings so the next layer can grip.
  • Make a compatibility and adhesion trial before coating a whole room, particularly where the old paint type is unknown.

Metal and Timber

Metal must be degreased and freed of the amount of rust required by the selected protective system. Hand brushing, power-tool cleaning and abrasive blasting are not equivalent preparation grades (AMPP surface-preparation summary). Timber should be dry, sanded with the grain and treated for resin, knots or decay as required; ends and hidden edges may need sealing before installation.

  1. Putty, Primer and Paint: What Each Does
Layer Purpose Shortcut to watch for
Repair filler Closes cracks, holes and local defects Filling a moving crack without investigating it
Wall putty or skim Improves plane and smoothness One heavy coat that later cracks or stays damp
Primer or sealer Controls suction, improves bond and isolates stains/alkalinity Cheap universal primer used on every substrate
Undercoat Builds an even base beneath enamel Finish enamel applied directly over patchy primer
Finish paint Provides colour, sheen, washability and weather resistance Over-thinning or spreading beyond the stated coverage
Clear coat or glaze Protects a decorative or timber finish Unapproved clear coat changing colour or sheen

 

Primer is not automatically “white paint.” It is selected for the substrate: masonry, gypsum, timber, ferrous metal, galvanized metal, stains or a difficult old coating. Putty is not a cure for dampness or structural cracking.

Ask to see the packs before opening. Check product name, colour code, base, batch, manufacturing/expiry information and damage. Photograph labels and retain one clean label or empty pack from each product.

  1. Common Ways Clients Get Short-changed
What happens How to check it
One coat is called two coats Record each room’s coat dates and photograph a marked test patch; the second coat should cover the complete plane, not only thin areas
Paint is over-thinned Compare water/thinner added with the product data sheet; use a measured container, not an unmarked bucket
Economy product replaces premium product Match every delivered pack to the written product name and invoice
Old loose paint is left underneath Inspect after scraping and before putty or primer; mark hollow, peeling and chalky areas
Dampness is hidden Use a moisture check and fix plumbing, roof, gutter, ground or condensation causes before painting
Putty is applied too thick Ask for separate thin coats and drying/sanding between them; heavy putty can shrink or crack
Bare repairs are not spot-primed Look for dull or shiny patches after the first finish coat; repaired areas should be sealed uniformly
Different batches produce shade variation Record batches and use one batch on a continuous wall; agree how batches will be boxed or blended
Final coat is rushed before other trades finish Complete dusty drilling, carpentry and ceiling work first; reserve controlled touch-up after fittings
Exterior paint is applied before rain or evening dew Check the forecast and the maker’s rain/dew restriction; stop when the safe drying window is not available
Rust is painted over Inspect metal after preparation and before primer; edges, welds, bolts and back faces need attention
Spray mist reaches glass, cars or neighbours Require screening, exclusion and wind control before spraying begins

 

A contractor’s material quantity is useful but not proof of coating thickness: roughness, porosity, loss, application method and thinning change coverage. Compare actual use with the manufacturer’s stated spread rate and the measured area, allowing a recorded waste factor.

  1. Drying Time Is Not Cure Time

“Touch dry” means the surface can be touched lightly. It does not mean it is ready for another coat, washing, closing a painted window, fitting hardware or heavy use.

Stage What controls the wait
Repair or putty to sanding Layer thickness, airflow, temperature and humidity
Primer to topcoat Primer chemistry, porosity and manufacturer’s minimum/maximum recoat window
First finish to second finish Product, colour, film thickness and site climate
Final coat to normal use Full cure can take much longer than touch-dry time
Exterior coating to rain/dew Product-specific weather resistance and actual drying conditions
Two-component coating Induction time, pot life, temperature and overcoat window

 

One Dulux interior emulsion example specifies a 4–6 hour recoat interval, but this is product-specific, not a universal rule (Dulux Promise SmartChoice). High humidity and lower temperature extend drying and cure (Benjamin Moore ADVANCE data). Write “as per approved technical data sheet under actual site conditions” into the contract rather than forcing every coat into one day.

  1. Protection, Access and Safety

Protect the Property

  • Empty the room where possible; otherwise move furniture to the centre and cover it completely.
  • Remove or individually mask handles, locks, plates, lights and fittings. Painting around them usually leaves rough edges.
  • Use taped floor protection and absorbent drop cloths, not a loose sheet that becomes a trip hazard.
  • Agree who pays for damage to stone, timber, glass, appliances, landscaping, vehicles and neighbouring property.
  • Keep one protected route for workers and materials. Do not drag ladders or paint cans across finished floors.
  • Record the condition of adjacent finishes with photographs before work.

Make Access a Contract Item

Exterior painting may need scaffold, a mobile tower or a powered platform. State who supplies it, how long it remains, whether it includes screening and who inspects it. A quotation based on ladders can become unsafe or expensive when the actual façade has deep projections, sloping ground or inaccessible corners.

Control Health Risks

Water-based paint still creates sanding dust and spray mist. Solvent coatings add vapour and fire risks. Two-component polyurethane may contain isocyanates; spraying can create very high exposure, so ventilation, product substitution, correct gloves/eye protection and suitable fit-tested respiratory protection may be required (HSE isocyanate guidance). OSHA identifies ventilation, eye/face protection and respiratory protection standards for spray work (OSHA spray operations). Keep children, pets and unprotected occupants out until the contractor declares the area safe.

  1. Handover Checks You Can Do Yourself

Inspect after the paint has dried enough to show its true colour and sheen, in the lighting normally used in the room. Strong handheld raking light can help diagnose preparation, but do not invent an extreme viewing condition after the contract unless it was part of the approved mock-up.

  1. Coverage: no old colour, putty, primer or substrate showing through.
  2. Uniformity: continuous walls should have consistent colour, sheen and roller texture, without patchy “flashing.”
  3. Surface defects: no runs, sags, curtains, pinholes, craters, heavy brush marks, roller tramlines, grit or embedded hair.
  4. Edges: straight colour breaks at ceilings, skirting, frames and corners; no paint on glass, hardware, labels, stone or switches.
  5. Repairs: cracks and patches should not reappear, bulge or remain visibly proud.
  6. Metal: no rust bleeding through, missed welds, bolts, edges or undersides.
  7. Timber: no stuck windows/doors, blocked drainage holes, missed end grain or dust trapped in clear finish.
  8. Exterior: no open cracks, peeling, blistering, rain streaks, uncoated recesses or blocked weep/drain holes.
  9. Cleaning: protection and waste removed without solvent or abrasive damage to adjacent finishes.
  10. Documents: receive colour codes, batch/product list, invoices where applicable, technical data sheets, warranty, maintenance instructions and labelled touch-up paint.

PCA describes a properly painted surface as uniform in appearance, colour, texture, hiding and sheen, and free from runs, sags, misses, spills and overspray caused by the painter (PCA P14). Use the approved mock-up to turn that principle into a project-specific decision.

  1. Care After Handover
  • Let the coating reach its stated cure before washing, scrubbing, sticking tape to it or placing furniture hard against it.
  • Clean with a soft cloth and mild product recommended by the paint maker; aggressive abrasives can polish matt paint or scratch enamel.
  • Keep bathrooms, kitchens and wardrobes ventilated. A mould-resistant paint does not correct condensation or leaks.
  • Repair roof, plumbing, gutter and sealant failures quickly; moisture behind paint commonly causes blistering and peeling (Dulux exterior acrylic data).
  • Keep labelled touch-up material from the same batch, tightly sealed and stored within the maker’s temperature limits. Touch-ups can still show on aged, glossy, dark or side-lit walls, so a full wall may need repainting.
  • Wash exterior surfaces gently where the coating system permits; do not aim high-pressure water into cracks, joints or weak render.
  • Record the product and repaint date for each area so future maintenance does not start with guesswork.
  1. A Checklist for the Contractor Meeting
  • Every room, elevation, door, frame, railing and excluded item listed
  • Existing defects and damp sources recorded before price agreement
  • Preparation level and responsibility for plaster/board repairs defined
  • Exact manufacturer, product, colour, sheen and coat sequence written
  • Primer matched to each substrate
  • Putty/filler thickness and number of coats stated
  • Sample panel or mock-up location and approver agreed
  • Labour-only or material-and-labour responsibility clear
  • Sealed packs, invoices and batch records required
  • Thinning and spread rate controlled by product data sheet
  • Recoat and cure times included in the programme
  • Scaffold, tower, screens, ventilation and protection priced
  • Spray or solvent safety controls agreed
  • Damage by other trades and final touch-up responsibility stated
  • Handover inspection, warranty, retention and maintenance information agreed

A good painter will welcome a clear scope and an approved sample. If a bidder refuses to name the products, inspect the background or explain the preparation, the low price is transferring risk to you.

The durations and examples in this guide are indicative. The approved project specification and each manufacturer’s current technical and safety data sheets take priority where they differ.